T&K Electrical
48 weeks
To design, install and commission new 11kV infrastructure to support a new 10MVA external connection for site growth.
HVPS supplied, installed and commissioned 2 no. 4 panel, 11kV, Schneider PiX, rack-able switchboards, and 2 x 1000kVA, Wilson E4 transformers and RMU’s.
The creation of a new 11kV ring served in 300mm Cu, BS7835 HV cable and integration and migration into the existing HV networks using 300mm Cu, BS7835 HV cable.
The design and installation of a new earthing system.